Mar 292013
 

 

Today I sorted out the boxes Simo YT3M sended me. I put it in boxes so i can sort out easely the stuff I need when I assemble the tower parts together.

Flanges  to be connected to the rings.

DSC00537

Bearing for the top mast.

DSC00538

Flanges to be connected to the rings.

 

 

 

 

 

 

 

DSC00540

These are the bolts and nuts to put the tower sections together.

DSC00542

Put them in a box.