Today the excavator driver made the field ready.
After that he digged me the 9 holes for the guy wire posts. 8 “small” ones and on big one.
Today the excavator driver made the field ready.
After that he digged me the 9 holes for the guy wire posts. 8 “small” ones and on big one.
The contracter who is doing the field had problems with the excavator.
The last part of the ditch has been dug and after that the excavator died again. The contractor brought in another excavator to finish the work. The ditch next to the house is now almost closed. Some other work has to be done. Hopefully this will be ready after the weekend.
The land consolidation people started to organize a new dam sot hat i can enter the filed closer by my house.. They also started to dig the ditch round the field and a last they will close the ditch between the house and the field.
Finally the cadastral survey people where here. Now I now exact what the new borders from the new property are and now I can start to figure out the positions off the new towers.
Last 2 meter contest we had some problems with the audio from the 144mhz pc. We could play our wav files after a while but the sound cards did not allow to record the contest with the ne separate program (qsorder) for N1mm. I put an other extra sound card (tks PA1M) in and now it is working fine.