Aug 152013
 

Today the boys have build the floor for the new radio room and expansion of the livving rrom.

DSC00959

floor with isolation and concrete mats. Below the isolation are concrete beams mounted.

DSC00965

Floor ready. Later the will be poured a second layer of concrete on top off this one.

 

Aug 082013
 

On july 8 the contractor has started with the renovation of my house. Also a new shack will be build.

DSC00774DSC00778DSC00840DSC00903

 

 

 

 

 

 

Jul 292013
 

Hilco PC1CP designed and welded me a gin pole system with witch we can lift the tower sections and an antennas. I have painted them quickly (forgot a few places hi) and we are ready for action.

DSC00928

Have to pint them later a bit better. but lets try it first.

DSC00929

Jul 262013
 
IMAG0291

Jan-Fokken with his shovel closing the holes and flatten the terrain a bit.

Jan Fokken came with his shovel and closed holes of the guy wire poles.

Jul 202013
 

This afternoon Jan PA0VAJ, Nap PA1NG  and Peter PA4PS came to help and put the first four towers sections on their feet.

DSC00909

The four towers on their feet.