Aug 152013
 

Today the boys have build the floor for the new radio room and expansion of the livving rrom.

DSC00959

floor with isolation and concrete mats. Below the isolation are concrete beams mounted.

DSC00965

Floor ready. Later the will be poured a second layer of concrete on top off this one.