29-06-2009 Mounted the last guy wire at the EME system.
26-09-2009 Ordered a cable for the microkeyer to my yaesu FT1000mp Mark5
25-06-2009 Bought a (second hand) microkeyer for my 50mhz station.
20-06-2009 Worked vp2mrt and 8r1db for two new dxcc on 50mhz
17-06-2009 Replaced dipole for 160m and 80m. Worked tm5sn for a new dxcc on 50mhz
10-06-2009 Replaced the tx coax from the 50mhz yagis. Also changed mounting off coax to the tower.
09-06-2009 Build an SW20 qrp tranceiver (local club project)
04-06-2009 Installed the new coils in the tunimhg unit for the vertical and aligned 80m.
03-06-2009 Worked 4o3a for a new dxcc on 50mhz
01-06-2009 Today I renewed the radial system for the vertical.
Done
I will ad some more radials.
I connected the radials to the copper ring.
I made a copper ring en connected it to the base plate.