29-06-2009   Mounted the last guy wire at the EME system.
26-09-2009   Ordered a cable for the microkeyer to my yaesu FT1000mp Mark5
25-06-2009   Bought a (second hand) microkeyer for my 50mhz station.
20-06-2009   Worked vp2mrt and 8r1db for two new dxcc on 50mhz
17-06-2009   Replaced dipole for 160m and 80m.  Worked tm5sn for a new dxcc on 50mhz
10-06-2009   Replaced the tx coax from the 50mhz yagis. Also changed mounting off coax to the tower.
09-06-2009   Build an SW20 qrp tranceiver (local club project)
04-06-2009   Installed the new coils in the tunimhg unit for the vertical and aligned 80m.
03-06-2009   Worked 4o3a for a new dxcc on 50mhz

01-06-2009   Today I renewed the radial system for the vertical.

Done

I will ad some more radials.

I connected the radials to the copper ring.

I made a copper ring en connected it to the base plate.