31- 03-2009 Removed the beverage antennes. In oktober they will be set up again.
30-03-2009 Made a better chuck for the elevation of the eme array.
25-03-2009 Aligned the azimuth rotor from the new eme system. Received first eme stations with the rebuild antenna.
23-03-2009 Strong winds made the system elevate 12 degrees. Have to make a better chuck.
22-03-2009 Finished the cable work and aligned out the antennas. Changed the actuator.
21-03-2009 With help from Jan we put the antennes back in the H frame.
20-03-2009 I rented a skylift for the weekend.
19-03-2009 Bought new coax cables for the updated EME system (the old ones are now to short)
18-03-2009 Jan PA0VAJ, Thomas PA1M and myself have set the constriction in uprigt position.
17-03-2009 Painted the new EME construction and put it back in the small tower.
16-03-2009 Jan PA0VAJ welded a new construction.
15-03-2009 Starting the rebuild of the crashed moonbounce system. The system crashed late September. It will be rebuild with a few changes.