This afternoon Jan PA0VAJ, Nap PA1NG and Peter PA4PS came to help and put the first four towers sections on their feet.
The hole for the guy post is 1.4 meter deep and 2 by 2.5 meter wide. Only the bottom 60cm is filed with concrete. On the poles are two wings welded. I wanted both of them in the concrete. With only 60cm of concrete the upper wing was not in the concrete, Also i want that the concrete is up till the surface so the post is not standing in the water.
For this we made two moulds. One for the bottom part and one for the upper part. Jan PA0VAJ and I poured the concrete we did one pole every day.
Sunday i hope to publish some new pictures from work in progress.
Stay tuned.
Today we where pouring 40m3 concrete for the guy posts and the feet for the towers.
Jan PA0VAJ, Hilco PC1CP, Peter PA4PS, Thomas PA1M and Jan-Fokkern a local farmer helped me. For the job Jan-Fokken brought his shovel.
More pictures later.