Aug 182013
 

Today Peter PA4PS, Myself, Jan PA0VAJ, Map PA1NG and Hilco  PC1CP (not on picture) where here to help to bring the tower sections to the field. We also have to select them. It seems that the four towers are build separately. So not all flanges fit to each other. We have two towers complete now.

Pictures Hilco PC1CP.

20130817_152937

Jan tells us story….

20130817_152915

Ready for transport.

20130817_182907

A few sections waiting to be positioned.

20130817_182921

Sections ready to be mounted together.

 

Aug 152013
 

Today the boys have build the floor for the new radio room and expansion of the livving rrom.

DSC00959

floor with isolation and concrete mats. Below the isolation are concrete beams mounted.

DSC00965

Floor ready. Later the will be poured a second layer of concrete on top off this one.

 

Aug 082013
 

On july 8 the contractor has started with the renovation of my house. Also a new shack will be build.

DSC00774DSC00778DSC00840DSC00903

 

 

 

 

 

 

Jul 292013
 

Hilco PC1CP designed and welded me a gin pole system with witch we can lift the tower sections and an antennas. I have painted them quickly (forgot a few places hi) and we are ready for action.

DSC00928

Have to pint them later a bit better. but lets try it first.

DSC00929

Jul 262013
 
IMAG0291

Jan-Fokken with his shovel closing the holes and flatten the terrain a bit.

Jan Fokken came with his shovel and closed holes of the guy wire poles.