Nov 122014
 

Today I have built the boxes with the relays for turning the towers and the box with the U links in the cabinet in the field.

2014-11-12 11.35.04

I removed the base plate out of the cabinet.

2014-11-12 11.59.41

I mounted the 2 boxes on the base plate.

2014-11-12 13.07.26

The base plate back in the cabinet. The roof had to come of to get the base plate in the cabinet.

2014-11-12 14.39.42

Danica has her own business. She is looking for mouse and mole.

2014-11-12 13.23.52

Box with relays mounted.

2014-11-12 14.41.04

Box with U links for connecting the double ten switch and stack matches to the station master deluxe mounted.