Aug 222010
 

I installed a bigger box for switches and the cables behind the tv dish.

Aug 152010
 

I am qsl manager for PI4GN. I had a back log and today i answered a lot of cards.

Aug 122010
 

Today I was at Bert PE1RKQ his station. I installed the rotator that I had repaired before in his tower again.

Jun 272010
 

Installed the new high voltage board in the GS35 144mhz amp and tested it.

Jun 262010
 

I got my new touch screen. I want to use this with the Green Heron rotator software. The isea is to get for each rotor 8 preset directions. Only on touch is needed to let the rotor go to his new position.