Nov 122014
 

Today I have built the boxes with the relays for turning the towers and the box with the U links in the cabinet in the field.

2014-11-12 11.35.04

I removed the base plate out of the cabinet.

2014-11-12 11.59.41

I mounted the 2 boxes on the base plate.

2014-11-12 13.07.26

The base plate back in the cabinet. The roof had to come of to get the base plate in the cabinet.

2014-11-12 14.39.42

Danica has her own business. She is looking for mouse and mole.

2014-11-12 13.23.52

Box with relays mounted.

2014-11-12 14.41.04

Box with U links for connecting the double ten switch and stack matches to the station master deluxe mounted.

Nov 022014
 

Near the north west tower I installed two closets. In here I will mount the double ten switches from Microham and the switching relays for the four towers to let them turn left and right.
I got these nice boxes from a friendly ham who works at the local county. They were not used anymore and would be would be discarded.

2014-10-24 11.45.08

Mole for the concrete.

2014-11-02 14.19.50

Finshed

2014-11-02 11.40.13

The base.

2014-10-25 12.30.56

Base with concrete

poured concrete

pouring concrete

2014-10-24 11.45.03

In the base I drilled four iron pipes from 3 feet in the ground to make the base more stable. Danice is checking my work.

 

 

 

 

Nov 022014
 

I builded a cable box half way from the house (shack) to the towers. Now it is easier to get new cables to the shack and the field.

 

 

Drilled with water two rods in the ground for grounding.

Drilled with water two rods in the ground for grounding.

 

concrate for the floor.  On the outside I also disposed concrete. At the top I builded bricks

concrate for the floor. On the outside I also disposed concrete. At the top I builded bricks

project finshed.

project finshed.